Sunday , 21 September 2014
Breaking News

FDOT to conduct meeting on US1 roadway project

The Florida Department of Tr a n s p o r t a t i o n (FDOT) District Six will conduct a public meeting about a roadway project along State Road (SR) 5/US1/South Dixie Highway from south of SW 112th Avenue to north of SW 184th Street/Eureka Drive.

The public meeting will be from 6 to 8 p.m. on Tuesday, Jan. 15, at South Dade Government Center, 10710 SW 211 St., Suite 203, in Cutler Bay. The meeting will be held as an open house and attendees are welcome to arrive any time between 6 and 8 p.m. to view the proposed plans and project displays. FDOT representatives will be available to discuss the project, answer questions, and receive comments on the proposed improvements.

The proposed work for the project includes: repaving the roadway to extend the life of the road; upgrading signage and pavement markings; updating pedestrian signals and crossings along the corridor; closing some unused driveways along the corridor, and making upgrades to the roadway and sidewalks, such as minor drainage structures modifications.

Construction is expected to begin in June 2014 and last about 200 days. The estimated construction cost is $3.6 million.

Contact Public Information Specialist Marilyn Marrero if you have any questions about this project at 305- 254-8598 or by email at mmarrero@mrgmiami.com

Go Back